{"id":84696,"date":"2019-09-17T15:30:11","date_gmt":"2019-09-17T13:30:11","guid":{"rendered":"https:\/\/hostsharing.gallehr.de\/case-study-energy-management-system-according-to-iso-500012018-2-the-challenge\/"},"modified":"2021-07-02T13:34:18","modified_gmt":"2021-07-02T11:34:18","slug":"case-study-energy-management-system-according-to-iso-500012018-2-the-challenge","status":"publish","type":"post","link":"https:\/\/gallehr.flei.dev\/en\/case-study-energy-management-system-according-to-iso-500012018-2-the-challenge\/","title":{"rendered":"Case study, energy management system according to ISO 50001:2018: 2. The challenge"},"content":{"rendered":"<h2>Introduction ISO 50001:2018, 2. the challenge<\/h2>\n<p>Since 2014, GALLEHR+PARTNER<sup>\u00ae<\/sup> has established a total of 15 complex energy management systems and had them independently certified according to <a href=\"https:\/\/de.wikipedia.org\/wiki\/ISO_50001\" target=\"_blank\" rel=\"noopener noreferrer\">ISO 50001<\/a>. From individual certifications of basic industries and an international research campaign to a pan-European <a href=\"https:\/\/gallehr.flei.dev\/modul-5-aufbau-multi-site-systeme-nach-iso-50003-und-iaf-matrix-systeme\/\" target=\"_blank\" rel=\"noopener noreferrer\">multi-site energy management matrix<\/a> in the electronics industry (semiconductor manufacturing and electronics assembly).<\/p>\n<p><a href=\"https:\/\/gallehr.flei.dev\/wordpress\/wp-content\/uploads\/2019\/09\/360GradEnergiemanagement.png\"><img decoding=\"async\" class=\"aligncenter size-medium wp-image-85169\" src=\"https:\/\/gallehr.flei.dev\/wordpress\/wp-content\/uploads\/2019\/09\/360GradEnergiemanagement-300x239.png\" alt=\"\" width=\"300\" height=\"239\" srcset=\"https:\/\/gallehr.flei.dev\/wp-content\/uploads\/2019\/09\/360GradEnergiemanagement-300x239.png 300w, https:\/\/gallehr.flei.dev\/wp-content\/uploads\/2019\/09\/360GradEnergiemanagement-1024x816.png 1024w, https:\/\/gallehr.flei.dev\/wp-content\/uploads\/2019\/09\/360GradEnergiemanagement-768x612.png 768w, https:\/\/gallehr.flei.dev\/wp-content\/uploads\/2019\/09\/360GradEnergiemanagement.png 1361w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>At the end of 2018, we were commissioned to develop an energy management system that was to be certified in accordance with the new <a href=\"https:\/\/www.iso.org\/iso-50001-energy-management.html\" target=\"_blank\" rel=\"noopener noreferrer\">ISO 50001:2018 standard revision<\/a> and at the same time serve as the basis for an <a href=\"https:\/\/gallehr.flei.dev\/modul-6-managementsystem-integration-qualitaet-umwelt-energie\/\" target=\"_blank\" rel=\"noopener noreferrer\">integrated management system<\/a>. That alone was an interesting challenge. However, it became more complex to meet the customer&#8217;s other requirements:<\/p>\n<ul>\n<li>Successful certification even before the start of production (no historical energy inputs available)<\/li>\n<li>Energy management in a fully automated factory (compatibility to the use of AI algorithms and further human-machine interfaces on different levels via <a href=\"https:\/\/de.wikipedia.org\/wiki\/Erweiterte_Realit%C3%A4t\" target=\"_blank\" rel=\"noopener noreferrer\">augmented reality<\/a> up to real-time monitoring)<\/li>\n<li>Modular structure as the basis for an integrated management system at the site<\/li>\n<li>Embedding in the Group&#8217;s own management and production processes<\/li>\n<li>Full compatibility with the group&#8217;s pan-European energy management matrix, which is certified to ISO 50001:2011 until further notice.<\/li>\n<\/ul>\n<p><a href=\"https:\/\/gallehr.flei.dev\/praxisbericht-energiemanagementsystem-nach-iso-500012018-3-verstehen-der-organisation-und-ihres-kontextes\/\"><strong>Continue with 3. understanding the organisation and its context<\/strong><\/a><\/p>\n<p><strong> <\/strong><\/p>\n<h3>Possibly also interesting for you:<\/h3>\n<ul>\n<li><strong><a href=\"https:\/\/gallehr.flei.dev\/praxisbericht-energiemanagementsystem-nach-iso-500012018-1-ueberblick\/\">Practical example 1. overview of ISO 50001<\/a><\/strong><\/li>\n<li><a href=\"https:\/\/gallehr.flei.dev\/kompetenz\/energiemanagement-beratungs-module\/\"><strong>The GALLEHR+PARTNER<sup>\u00ae<\/sup> consulting modules on energy management systems<\/strong><\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Introduction ISO 50001:2018, 2. the challenge Since 2014, GALLEHR+PARTNER\u00ae has established a total of 15 complex energy management systems and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[417,429],"tags":[544,545,546,547,548,462,468,469,524],"class_list":["post-84696","post","type-post","status-publish","format-standard","hentry","category-news","category-archive","tag-integrated-management-system","tag-energy-efficiency","tag-iso50001-en","tag-energy-management-matrix","tag-man-machine-interfaces","tag-multi-site-certification","tag-energy-management","tag-iso-500012018-en","tag-din-en-iso-50001-en"],"_links":{"self":[{"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/posts\/84696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/comments?post=84696"}],"version-history":[{"count":0,"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/posts\/84696\/revisions"}],"wp:attachment":[{"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/media?parent=84696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/categories?post=84696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gallehr.flei.dev\/en\/wp-json\/wp\/v2\/tags?post=84696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}